BROAD CAUSEWAY BRIDGE REPLACEMENT PD&E STUDYFPID Number: 452428-1-21-01ETDM Number: 14520TBHI Number: BC-160
Public Involvement:
• Public Involvement Plan (February 2023)
• Comments and Coordination Report (July 2024)*
Engineering:
• Bridge Development Report (July 2024)
• Bridge Hydraulics Report (July 2024)*
• Existing Signing Inventory Report (November 2023)
• Preliminary Geotechnical Report - Roadway (February 2024)
• Preliminary Geotechnical Report - Structures (February 2024)
• Lighting Design Analysis Report (July 2024)
• Location Hydraulics Report (July 2024)
• Preliminary Engineering Report (October 2025)
• Project Traffic Analysis Report (March 2024)
• Pond Siting Report (July 2024)
• Typical Section Package (March 2025)
• Utilities Assessment Package (July 2024)
Environment:
• Air Quality Technical Memorandum (December 2023)
• Cultural Resource Assessment Survey (April 2024)*
• Contamination Screening Evaluation Report (May 2024)
• FDEP Sea Level Impact Projection Report (August 2023)
• Natural Resource Evaluation (April 2024)
• Natural Resource Evaluation Addendum (July 2024)
• Noise Study Report (July 2024)
• Research Design and Survey Methodology (May 2023)
• Section 106 Case Study Report (May 2024)
• Section 4(f) Resources Report (October 2025)
• Sociocultural Effects Evaluation Technical Memorandum (July 2024)
• Type 2 Categorical Exclusion (October 2025)
• Water Quality Impact Evaluation (September 2023)
Additional Documentation:
• Notice of Limitation of Claims
• Location Design Concept Acceptance Notification
• Memorandum of Agreement Between Town and SHPO
• Project Commitments Record
• Public Hearing Certification Form
• Public Hearing Transcripts
*These reports do not include the Appendices due to size limitations. The full report is available upon request.